Treat a subcontractor's premises as one of your warehouses: send material with a transfer, receive finished goods against a subcontracting order, consume components by a known rule, and reconcile the balance every month.
Your material, someone else's building
Subcontracting looks simple. You send a subcontractor your raw material, they plate, machine, paint or assemble it, and send it back. You pay them for the work. The trouble is everything between those steps.
Your material is now in a building you do not control. It is still your stock and still on your balance sheet, but it is invisible to the stores team. Partial lots come back. Some material is scrapped at the subcontractor. Someone sends extra to be safe. After a few months the books say one thing, the subcontractor's records say another, and nobody can reconcile them without a site visit and an argument.
The way out is to model the arrangement properly from the start.
Model the job before you send anything
Sundial (on the ERPNext engine) handles subcontracting with a few connected records. The finished item you get back is marked as subcontracted. A bill of materials lists the components you will supply for each unit. The work the subcontractor does is a service item on a purchase order, priced per unit. From that purchase order you create a subcontracting order, which ties the service, the finished item and the components together.
Each subcontractor gets a supplier warehouse in Sundial: a warehouse that represents their premises. This is the single most useful decision in the whole setup. Material at the subcontractor is not a note in a file; it is stock in a named warehouse, with quantities and value, visible in the same stock reports as everything else.
Sending material
When material leaves, record it as a transfer from your store to the subcontractor's warehouse against the subcontracting order. Sundial knows from the order and the BOM what should go and how much, and shows what has already been sent, so the stores team is not guessing.
Send what the order needs, not what is convenient. If you routinely over-send, record it, because the extra is still your stock and it will need to come back or be consumed later. If the subcontractor needs to supply some components themselves, mark them that way in the order so they are not expected from your store.
Batch and serial numbers travel with the transfer. If a batch of steel goes out, the same batch number appears on the subcontractor's warehouse and later on what is consumed, which keeps traceability intact through a process that happens outside your walls.
Receiving and consuming
When finished goods come back, record a subcontracting receipt against the order. It adds the finished items to your store and consumes the supplied components from the subcontractor's warehouse. Sundial supports two common rules for that consumption: backflush based on the BOM (consume what the BOM says each unit needs) or based on what was actually transferred. Pick one per company and stick with it, because switching makes history hard to read.
Partial receipts are normal. The order shows what has been received and what is still pending, and the subcontractor's warehouse shows the components still with them. Rejections at receipt can go through the same quality inspection you use for purchased items, with rejected quantities kept apart.
The finished item's cost is built from the components consumed plus the service charge, and any freight or handling can be added as landed cost. That gives you a real unit cost for subcontracted items instead of a standard someone set years ago.
Reconcile every month
Once a month, compare the subcontractor's warehouse in Sundial with their own records. Because every movement in and out was recorded against an order, differences are usually easy to trace: a receipt not yet entered, a return of unused material, scrap that needs to be written off with a stock entry and a reason.
Return unused components when a job closes rather than letting them accumulate. A small balance left at each of ten subcontractors is how material quietly disappears.
Material held by a subcontractor can raise its own questions on sales and use tax, insurance and year-end inventory counts; work through those with your accountant. Sundial gives you the movement records they will ask for. We are also designing for an agent that drafts the monthly reconciliation for each subcontractor and highlights the lines that do not match, for someone on the buying team to resolve.